Black Friday supercut in Timeline: 12 segments vs auto chunking
Timeline accepts up to 200 video slots. A single strategy is refused above 12 segments (render_strategy_unsafe); auto chunks the render past 12.

A Black Friday supercut of more than 12 clips needs the auto render strategy in Sume Timeline 1.0. With strategy set to single, a request above 12 segments is refused with render_strategy_unsafe; with auto, Sume chunks the render. The request can hold 1 to 200 video slots.
Limits
From the Timeline docs, as of 2026-10-08.
| Field | Limit |
|---|---|
| video[] slots | 1 to 200 |
| audio.duration_seconds | 1 to 1800 |
| audio.parts[] | up to 20 |
| single strategy | 12 segments or fewer |
| Adjacent fades | 8 at most |
| Price | $0.10 per ceil(output minute) |
A 40-clip example
Forty 3-second product clips make 120 seconds, which is 2 output minutes and $0.20 to join. Auto splits the render into chunks, so no render holds more than 12 segments. Use hard cuts for most joins; adjacent fades past 8 are refused with too_many_chained_transitions.
- Plan first, render second.
- Keep each segment's source resolution consistent so the fit setting does not surprise you.
- Music: one audio track up to 1800 seconds, or up to 20 parts.
Cost check
Cost depends on output minutes only: 40 x 3 s = 120 s = 2 minutes = $0.20, whatever the number of chunks. Clip generation is the larger line: a 3 s Wan 3.0 clip at 720p is 3 x $0.125 = $0.375, so 40 of them are $15.00.
Soundtrack and captions
A supercut usually has one music bed. Timeline accepts audio of 1 to 1800 seconds, and the soundtrack can duck under voice by 0 to 20 dB (duck_db). If you want captions on top, burn them after the join: the caption job is $0.20 for a clip up to 60 seconds.
For a 120-second cut, captions need two jobs, because 60 seconds is the cap per job: 2 x $0.20 = $0.40.
- Join: $0.20 for 120 s.
- Captions: 2 x $0.20 = $0.40.
- Total post-production: $0.60.
Before you scale
The plan endpoint is the right place to learn about limits. It is not billed, and it reports problems such as too many chained transitions or a segment count that the single strategy would refuse. Make it a step of the script: plan, check for errors and warnings, and only then render. For a catalog of supercuts, plan every one before you render any.
Sources
Related posts
More in Media tools
- Timeline refuses more than 8 chained fades: countdown cut fix
Sume Timeline 1.0 refuses more than 8 adjacent fades with too_many_chained_transitions. Alternate hard cuts and fades in a 12-clip holiday countdown.
- Timeline audio concat fails on mono plus stereo: channel mismatch
Joining a mono and a stereo file in Sume timeline audio returns audio_parts_channel_mismatch. Detach both as mono, or match layouts first.
- Mixing 24 fps Seedance clips with 30 fps footage in Sume Timeline
Set output.fps to 24, 25, 30 or 60 in Timeline 1.0. If you omit it, the job matches the sources, and a mismatch returns output_fps_resamples_sources.
- Timeline output fps: omit it to follow your clips, or get a warning
Leave output.fps out and Timeline 1.0 follows your longest video sources. Force 30 on 24 fps clips and the job warns output_fps_resamples_sources.
Written by Sume