Hy Image 3.5 Preview price: $1.60 per million tokens, not per image
Tencent Hy Image 3.5 Preview is priced per token on OpenRouter, so a per-image cost needs a measured count. What that means next to Sume's per-image billing.

Tencent Hy Image 3.5 Preview is listed at $1.60 per million tokens on its OpenRouter page, which is a token rate and not a price per image. You cannot turn it into a per-image cost without knowing how many tokens one of your generations uses, and the page does not give that number.
This matters for anyone budgeting a batch this week, because the listing shows a release on Oct 5, 2026 and most price comparisons you will find quote a per-image figure for other models. Mixing a token rate with a per-image rate gives a wrong total.
What the vendor page states
The OpenRouter listing, read today, names a dated model id, tencent/hy-image-v3.5-preview-20260922, and describes text-to-image, image-to-image and multi-turn editing, up to 20 reference images and output up to 4K. The price line reads $1.60 per million tokens.
The page does not state how many tokens a 1024x1024 or a 4K output consumes, so any per-image dollar figure for Hy would be a guess. This post does not give one.
| Item | Listing value |
|---|---|
| Released | Oct 5, 2026 |
| Dated id | tencent/hy-image-v3.5-preview-20260922 |
| Price | $1.60 per million tokens |
| Reference images | Up to 20 |
| Output size | Up to 4K |
| Modes | Text-to-image, image-to-image, multi-turn editing |
How Sume prices an image instead
Sume meters image models per image, not per token. The Image API returns a usage.cost field in USD, and the token counts in usage are always 0 in v1. A failed or cancelled generation is not charged, as the Image API docs describe.
Sume does not list a Hy model today. You can confirm that for your own workspace by calling GET /v1/images/models, which returns the models with their capabilities. If Hy appears there later, the catalog row, not this post, is the price to trust.
- Token-priced model: cost = tokens used x rate, so it varies with prompt, references and size.
- Per-image model on Sume: the response reports the cost in
usage.cost. - Preview models can change price, so re-read the page on the day you budget.
Worked arithmetic, with a placeholder count
The formula is simple: cost = tokens used divided by 1,000,000, times $1.60. As arithmetic only, a hypothetical job that used 1,000 tokens would cost $0.0016, and one that used 10,000 tokens would cost $0.016. Those token counts are placeholders chosen to show the formula, not measurements of Hy Image 3.5 Preview, and the vendor page gives no figure to replace them with.
The reason to run the formula on your own numbers is that the spread between a small and a large job can be wide, and a flat per-image guess hides it. Record tokens per job for a week, then use the median and the 90th percentile for your forecast.
- Log the token count the vendor returns with each result.
- Log size, number of references and whether the call was a first turn or an edit turn.
- Compare the median with the worst case before you promise a client a flat price.
How to budget a token-priced image model
Run a small sample of real jobs, record the tokens the vendor reports for each, and multiply by the rate. Do this at each size and with and without references, since reference images are inputs and may count too. The vendor page does not say whether they do, so measure it instead of assuming.
If you need a price you can fix in a spreadsheet today, use a model that already has a per-image row. For a Sume example of a fully calculated grid, see the GPT Image 2.5 xhigh and max price grid.
A last point on comparing quotes: when two vendors quote in different units, convert both to cost per approved image, not per generated image. If a model needs three tries to reach an acceptable result, its effective price is three times the sticker price. Sume's billing note matters here: a failed or cancelled generation is not charged, but a completed one that you reject still is. Track your own acceptance rate for any model you test, preview or not, and divide spend by approved outputs. That single number is more useful in a budget meeting than any list price, and it works for token-priced and per-image-priced models alike.
Sources
Related posts
More in Pricing
- Ideogram 4.5 high ($0.275) vs GPT Image 2.5 high ($0.0405)
At high quality a 16:9 thumbnail costs $0.275 on Ideogram 4.5 and $0.0405 on ChatGPT Image 2.5 at 1536x864 on Sume: 6.8x. Run a text test before you pay it.
- Ideogram 4.5 costs the same at 1K and 2K: pick 2K by default
Ideogram 4.5 is priced by quality tier, not size: $0.03, $0.06 or $0.22 list. On Sume you choose resolution 1K or 2K, so the size is a free choice.
- Image edit price sheet on Sume: Ideogram 4.5, GPT 2.5, cutout, upscale
What image editing costs on Sume, October 2026: Ideogram 4.5 $0.0375 to $0.275, GPT Image 2.5 by quality, RMBG $0.0225, Upscale $0.20, and chained pipelines.
- Is Gemini 3.8 Flash TTS free? Free tier vs paid prices, Oct 2026
Gemini 3.8 Flash TTS lists a free tier; paid output is $9.00 per million audio tokens through 2026 and $18.00 from 2027. Prototype free, then price it.
Written by Sume