90-second trailer: 3 jobs on Wan 3.0 or Seedance 2.5

90 seconds of trailer on Sume: 3 jobs, $11.25 on Wan 3.0 and $52.0020 on Seedance 2.5 at 720p. 480p and 1080p priced too.

4 min readSume
All posts

A 90-second trailer is more than one job on Sume: Wan 3.0 and Seedance 2.5 each stop at 30 seconds per request, so it takes 3 jobs of 30, 30, 30 seconds. At 720p and 9:16 the set costs $11.25 on Wan 3.0 and $52.0020 on Seedance 2.5.

The limits come from Sume's video generation docs (read 2026-10-06): seedance-2.5 accepts 4 to 30 seconds at 480p, 720p and 1080p, and wan-3.0 accepts 2 to 30 seconds. A trailer up to 30 seconds therefore needs no stitching.

What does a 90-second trailer cost by model and resolution?

Both prices below are computed from Sume's rate card on 2026-10-06 for a 9:16 request. Wan 3.0 is a per-second rate by resolution; Seedance 2.5 is priced by video tokens, so its price scales with the pixel count too.

Total billable USD, all jobs, computed from the Sume rate card, read 2026-10-06. Check GET /v1/catalog for live prices.
Model and resolutionJobsTotal
Wan 3.0, 480p3$5.6250
Seedance 2.5, 480p3$24.18093
Wan 3.0, 720p3$11.25
Seedance 2.5, 720p3$52.0020
Wan 3.0, 1080p3$22.50
Seedance 2.5, 1080p3$127.9395

How do I send it?

Submit with POST /v1/videos, send an Idempotency-Key so a retry returns the original job, and poll the polling_url or pass an HTTPS callback_url. Send 3 requests, one per segment, and join the clips afterwards with a Timeline render.

curl -X POST "https://api.sume.com/v1/videos" \
  -H "Authorization: Bearer $SUME_API_KEY" \
  -H "Content-Type: application/json" \
  -H "Idempotency-Key: clip-wan-3.0-30s-001" \
  -d '{
    "model": "wan-3.0",
    "prompt": "A product on a desk, slow push-in, natural light",
    "duration": 30,
    "resolution": "720p",
    "aspect_ratio": "9:16"
  }'

What should I check first?

Prices change when providers change theirs, so the table is a snapshot, not a quote.

  • Read supported_durations and supported_resolutions from GET /v1/videos/models before you pick a length.
  • Sume reserves the provider list price times 1.25 at submit; usage.cost on the finished job is the billable amount.
  • Segments are separate generations, so keep the same prompt scaffolding and reference images in each to keep the trailer consistent.

Sources

Related posts

More in Pricing

All Pricing posts

Written by Sume