Sume 409 errors: job_not_completed, job_not_cancelable and more

A Sume 409 means the job operation does not fit the job's current status: job_not_completed, job_not_cancelable or job_generation_already_started.

4 min readSume
All posts

A 409 means the requested job operation is not valid for the current status. The documented codes are job_not_completed, job_not_cancelable and job_generation_already_started (read 2026-10-06 in the errors docs).

What should my client do?

Read the job status first. Fetch results only from a completed job, and cancel only before generation starts.

What should I do in practice?

The status vocabulary is on the same page.

  • Poll until terminal before reading results.
  • Do not retry a 409 blindly.
  • Cancel queued jobs early.

Sources

Related posts

More in Developers

All Developers posts

Written by Sume