Recut a Christmas clip into a New Year sale ad for $0.30
A Timeline render at $0.10 and a caption job at $0.20 turn a finished Christmas clip into a New Year sale cut. Three variants cost $0.90.

If you already have a Christmas clip, a New Year sale cut is a recut, not a new generation. A Timeline render is $0.10 per output minute and a caption job is $0.20, so one 15-second cut is $0.30 and three variants are $0.90.
What changes between the two ads
Keep the footage and change the story: a different first second using source_in, the sale line burned in as caption cues, and a different music bed.
| Item | Price | One variant | Three variants |
|---|---|---|---|
| Timeline render, under 1 min | $0.10 | $0.10 | $0.30 |
| Caption job with cues | $0.20 | $0.20 | $0.60 |
| Total | $0.30 | $0.90 |
Steps
Import the clip to media.sume.com first, since Timeline accepts only media already there. Plan the cut for free, then render with an Idempotency-Key.
- POST /v1/media-imports for the source
- POST /v1/timeline-1.0/plan to check, unbilled
- POST /v1/timeline-1.0/render with an Idempotency-Key
- POST /v1/video-captions with cues for the offer line
Keep the sale line editable
Burn the offer in as caption cues rather than baking it into the generated frames. A date or percentage change is then a $0.20 re-run, not a new clip.
Dates
New Year's Eve is Thursday, Dec 31, 2026, which is 88 days from Oct 4. Cut the sale ad in the week of Dec 21.
Sources
Related posts
More in Use cases
- Newsletter paid-upgrade pitch as a 45-second avatar clip: cost
What a 45-second talking-avatar pitch for your paid newsletter tier costs on Sume: $8.28 at Standard, $11.03 at Plus. Request body, 4-60 second limit.
- Nonprofit year-end impact recap from five photos for Giving Tuesday
A 50-second year-end recap for a nonprofit from five photos: voice-over, music bed, one Timeline render and captions. $0.4678 on Sume, from docs.
- Official Artist Channel Shorts rule starts Dec 8, 2025: trim to 3:00
On an Official Artist Channel, square or vertical videos up to 3 minutes uploaded from Dec 8, 2025 count as Shorts. Cut the clip with Sume video trim.
- Digital Omnibus timeline: June 16 to July 27 in order
A dated list of the EU Digital Omnibus steps as reported in 2026, from Parliament on June 16 to entry into force on July 27, with the Art. 50(2) grace date.
Written by Sume