Music Router: 24 takes cost $3.00, every model charges $0.125
Sume's Music Router charges the fixed Music price per audio generation whichever model it picks. Twenty-four takes cost 24 x $0.125 = $3.00.

Every Music Router model charges the fixed Music price per audio generation, which is $0.125 on Sume. Twenty-four takes cost 24 x $0.125 = $3.00, so you can choose a model by sound rather than by price.
What the docs say
The Music Router guide states that every model charges the fixed Music price per audio generation and that the catalog lists the provider list price per model for reference. The Music 1.0 guide gives the fixed price as $0.125 per accepted generation and notes that Music 1.0 requests now resolve through the router.
Budgeting takes
Pick a number of takes per scene, then multiply.
| Plan | Takes | Cost |
|---|---|---|
| One bed for one ad | 1 | $0.125 |
| 3 takes for each of 8 scenes | 24 | $3.00 |
| 5 takes for each of 12 episodes | 60 | $7.50 |
| Library of 200 beds | 200 | $25.00 |
Where the saving is
Because the price does not move with the model, the only way to spend less is to generate fewer takes. Write a clear brief, with length, sections and exclusions in the positive prompt, as the guides advise, so the first take is usable more often. If one in three takes is kept, each kept bed costs $0.375.
Remember that a failed job is released rather than captured, per the usage statuses, so only accepted generations count against the figure.
Prompts that waste fewer takes
Because take count is the only lever, spend effort on the brief. The guides recommend controlling length in the prompt, such as a 2-minute track, and using section markers such as [0:00-0:30] Intro: .... Put exclusions in the positive prompt, for example no vocals and no spoken word.
A clear brief with two or three takes per scene costs $0.25 to $0.375 per scene. Ten scenes at three takes is $3.75. Use an idempotency key per take so a retry does not buy a second track.
- Price: $0.125 per accepted generation.
- Prompt limit: 1 to 5000 characters.
- Failed jobs release their reservation.
Library math
A content team that wants 50 reusable beds, with three takes each, spends 150 x $0.125 = $18.75 and keeps 50. Repeating this monthly for a year is $225.00. Compare with the cost of one avatar video of 30 seconds on plus at $7.35: a year of beds costs about 30 such clips.
These numbers assume no failed jobs. Failed jobs are released, so they do not add to the total.
Sources
Related posts
More in Pricing
- Music Router at 12.5 cents a song vs ElevenLabs at 15 cents a minute
Sume's Music Router charges a fixed $0.125 per generation. ElevenLabs lists Music at $0.15 a minute, and Gemini lists Lyria 3.5 at $0.08 a song. The sums.
- Nano Banana 2.1 for 400 product images: $30 at 0.5K up to $80 at 4K
Nano Banana 2.1 replaced Nano Banana 2 on Sume this week. 400 images cost $30 at 0.5K, $40 at 1K, $60 at 2K and $80 at 4K. Arithmetic and a mixed plan.
- Nano Banana 2.1 4K is 3.4x the 1K price at Google, 2x on Sume
Google bills 1,120 tokens at 1K and 3,780 at 4K for Nano Banana 2.1, a 3.375x gap. Sume's tiers go $0.10 to $0.20, 2x. Why the ratio differs.
- 1,000 thumbnails: Nano Banana 2.1 at 0.5K saves $25 over 1K on Sume
1,000 images on Nano Banana 2.1 cost $75 at 0.5K and $100 at 1K on Sume, a 25% saving. When 512px is enough and when to step up.
Written by Sume